Floor plan with Door Schedule / Window Schedule - Help understanding schedules

Started by ThirdDimension, June 10, 2015, 04:26:00 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

ThirdDimension

The Walls, Shells, and Structures stencil template has a a stencil for door schedule and window schedule.  When you drop this stencil on the drawing, it automatically calculates how many doors are required for the build.

I would like to design a schedule for light fixtures.  Can anyone point me in the right direction on how to build a schedule for this?

Nikolay

This "Window Schedule" report uses the Visio "Shape Report" feature.

You can check out the built-in "Window Schedule" report and build your own based on that report.
The reports can be found on Review -> Reports.

The tutorial on Visio reports from visio MVPs can be found on youtube:
https://www.youtube.com/watch?v=Lm1ZrkPpI1U

ThirdDimension

Thank you!!!

I reviewed the video and have a better understanding now.  Moving forward, here is my next problem.  I want to build a schedule that includes additional required parts.

For example, if bolt "A" always requires 2 washer and 3 nuts, how do I add these attributes to bolt "A" so they appear in the part schedule when I auto generate?

thanks again!!!!!!

Browser ID: smf (is_webkit)
Templates: 4: index (default), Display (default), GenericControls (default), GenericControls (default).
Sub templates: 6: init, html_above, body_above, main, body_below, html_below.
Language files: 4: index+Modifications.english (default), Post.english (default), Editor.english (default), Drafts.english (default).
Style sheets: 4: index.css, attachments.css, jquery.sceditor.css, responsive.css.
Hooks called: 170 (show)
Files included: 34 - 1317KB. (show)
Memory used: 1083KB.
Tokens: post-login.
Cache hits: 12: 0.00226s for 26,582 bytes (show)
Cache misses: 1: (show)
Queries used: 13.

[Show Queries]