Is it possible to create a smart connector or maybe some sort of Bracket Interval that could calculate the difference in "Finish" dates.
I attached a sample of what I am doing manually, but wondered if this could be done in Visio.
I calculate the differences externally in Excel before linking to Visio, would this help in any way...
I am assuming the connector would have to read the finish date upon gluing to the milestone shape.
Thanks for any help with this function.
FlowerGirl.
Here's a couple of variants. Modified interval shape. These show elapsed time in days. This could be changed in the shapesheet / shapedata entry.
Wapperdude
Thanks so much for your response.
I changed the day count from days to month.days to 1 decimal point :D
using this formula =FORMAT(Sheet.769!User.Duration/30.4,"0.0")*1
I will let you know shortly how it worked in my project.
FlowerGirl :-*